SolarPanelMatch
California · CSLB classes A, B, C-10, C-46 · Net billing

How does buying solar work in California?

A contractor holding a CSLB A, B, C-10 or C-46 license may install solar on a California home. No federal credit applies to a system finished in 2026, so the price on the contract is the price you pay, and what decides whether solar pays back is your utility's export credit and your own roof. California puts a disclosure page on the front of every solar contract and gives you three business days to cancel.

Contractor license
CSLB A, B, C-10 or C-46
Down payment limit
$1,000 or 10 percent
Whichever is less.
Right to cancel
3 business days
Five for buyers 65 or older.
Net billing applies from
April 15, 2023
Interconnection applications in PG&E, SCE and SDG&E territory.
Federal credit, 2026 installs
None
Not available for property placed in service after Dec. 31, 2025.
CSLB phone
800-321-CSLB (2752)

Get matched with a solar installer in California

Pick the job, give your ZIP code, then add how we should reach you; all three steps are free.

What do you want done?
Something else · all 11 services

The form asks for a phone number only after it finds an installer that covers your ZIP.

You pay nothing, and the installer that gets your request pays us. How it works

Licensing: who may install solar on a California house

Four CSLB classes can legally install photovoltaic systems, per CSLB's Solar Smart page: A (General Engineering), B (General Building, which CSLB ties to the Business and Professions Code 7057 definition of two unrelated building trades), C-10 Electrical and C-46 Solar, whose text covers work to install, modify, maintain and repair thermal and photovoltaic systems. Classes C-4, C-36 and C-53 are for solar heating only. Ask any company for its license number and class and check them on CSLB's license lookup.

The person who sells the job needs a registration of their own. Under B&P 7153 and 7154, as CSLB bulletin 20-22 reads them, a home improvement salesperson must register with CSLB and with the solar contractor they sell for, unless the buyer starts the sale at a fixed retail storefront.

CSLB receives and reviews solar complaints (B&P 7170) and reports them every year. You can reach it at 800-321-CSLB (2752) or P.O. Box 26000, Sacramento, CA 95826. The California Energy Commission keeps solar equipment lists but says listing is not a statewide installation requirement, though some utilities or local governments may ask for it.

Solar installation rules

No federal credit, one cover page and the contract rules

The IRS says the Residential Clean Energy Credit was 30 percent for property installed 2022 through December 31, 2025, and that it is not available for any property placed in service after that date. A payment made in 2025 for a system completed in 2026 does not help, since the completion date of the installation controls. Batteries are covered by the same section.

Under B&P 7169 the front or cover page of every solar contract must carry the Solar Energy System Disclosure Document, printed in boldface 16-point type, with the total cost including financing costs, the complaint route and your right to cancel. The contract and the disclosure must be in the language the pitch was given in. Because CSLB treats a residential solar installation as home improvement, a contractor cannot take a down payment above $1,000 or 10 percent of the price, whichever is less (B&P 7159.5), and the contract needs start and completion dates.

You have three business days to cancel (B&P 7159), or five if you are 65 or older on a contract entered since January 1, 2021, and the contractor must return what you paid within 10 days of receiving your notice. Ask each company in writing for the total price with financing, the system size in kW DC, the cost per watt before incentives, the panel and inverter models, who files the utility application and who pulls the permit. A lease or PPA means you don't own the system, and CSLB's supporting-information form asks whether the contract can transfer to a new homeowner.

What to put in writing

How California pays for the power you send out

Since April 15, 2023, customers applying for interconnection in PG&E, SCE and SDG&E territory take service on the net billing tariff (NBT), which the utilities call the Solar Billing Plan and many people call NEM 3.0. The CPUC credits exports from its Avoided Cost Calculator, hour by hour, and says the values are usually lower than import rates. The same CPUC text says export credits can rise above the retail rate on late summer evenings, and that about 70 percent of NBT customers had paired a battery by the end of 2024.

NBT customers keep the tariff for nine years. Residential PG&E and SCE customers who apply before the end of 2027 get an export adder for nine years, SDG&E is excluded, and customers required by building code to add solar do not get it. SCE's first-year enrollees get an extra $0.04 per kWh export credit. NBT customers must use an electrification time-of-use rate and are billed monthly.

The NEM tariffs are closed to new enrollments. PG&E's applications from before April 15, 2023 had to finish before April 15, 2026, and customers already on NEM 2.0 may stay 20 years from the date they interconnected. LADWP and SMUD are municipal utilities, and net billing and Rule 21 do not apply there. For batteries, the SGIP Small Residential Storage step at $0.15 per Wh is Closed at CSE, SCE, SoCalGas and PG&E as of October 23, 2026, and the equity budgets are for low-income households.

Battery storage in California

From permit to permission to operate

Under Gov. Code 65850.5 a city or county shall approve a solar application administratively, through a building permit or similar nondiscretionary permit, and review is limited to health and safety. SB 379 requires most cities and counties to run an online automated permitting platform for a residential system up to 38.4 kW AC with storage. The deadline was September 30, 2023 for cities and counties over 50,000 people and September 30, 2024 for smaller non-exempt cities; cities under 5,000 and counties under 150,000 are exempt. The CEC counted 363 jurisdictions self-reporting a platform as of October 8, 2025, and does not certify compliance. SolarAPP+ is one of the platforms and is not required by name.

Gov. Code 66015 says a residential PV permit fee may not exceed $450 plus $15 for each kilowatt above 15 kW, unless the city adopts a written finding. It is a limit, not a fee. Riverside's schedule of June 18, 2025 prints $350 for a residential system up to 15 kW, and Oakland's FY 2025-26 schedule prints $450 for the inspection. Chula Vista's September 2024 bulletin prints an expedited total of $453.

The utility applies Rule 21 after the permit. PG&E says permission to operate typically takes 5 to 10 business days, up to 30, with a $145 fee. SCE says about 10 business days for a simple solar-only request, up to 30 when busy, with the CPUC's $94 figure. SDG&E's October 2024 deck puts initial review at 15 business days, and its $132 fee is as of a December 2023 page copy. No residential Solar Billing Plan application fee appears on SDG&E's current solar pages, so get the figure from the installer in writing. The 2022 Residential Code R324.6 asks for two pathways at least 36 inches wide on separate roof planes, and the 2025 code took effect January 1, 2026 and may differ.

Interconnection and permits

Selling a home with solar, and the January 1, 2027 tax date

Revenue and Taxation Code 73 excludes a new active solar system from property tax reassessment only for systems completed before January 1, 2027, and those systems stay excluded until a change in ownership. A system finished on or after that date falls outside the exclusion as the statute stands. Ask the company for the completion date in writing.

If the system is leased or on a PPA, ask whether the contract can transfer to the buyer. Customers on NEM 2.0 may stay on that tariff for 20 years from the date they interconnected, so keep the permission-to-operate letter with the sale papers. On a newly built single-family home, the 2025 Energy Code (section 150.1(c)14, effective January 1, 2026) requires PV, with five exceptions; additions are not covered.

Solar and a home sale

What solar costs in California: the evidence we have

Each estimate row is a model and not a quote: published national ranges adjusted by what California installers are paid, with a typical city permit fee added where the work needs one. No federal credit is subtracted, because none applies to a 2026 installation. The wage and permit rows are pay and fees, and Berkeley Lab's median and the utility fees are shown as published. We print the model and the median side by side and don't reconcile them.

California solar cost evidence, prices as of Oct 23, 2026
ItemFigureWhat it is
Solar panel installation$21,500 to $29,600 for a typical 7 kW rooftop system, before any incentiveEstimated range, not a quote. The service page shows how it is built.
Ground-mount solar$24,500 to $32,600 for a typical 7 kW ground-mounted system, before any incentiveEstimated range, not a quote. The service page shows how it is built.
Home battery$8,200 to $18,600 per home battery (about 10 to 13.5 kWh) installed, before any incentiveEstimated range, not a quote. The service page shows how it is built.
Panel removal and reinstall$220 to $435 per panel, removed and put back for roof workEstimated range, not a quote. The service page shows how it is built.
Solar repair$370 to $1,250 per repair visitEstimated range, not a quote. The service page shows how it is built.
Inverter replacement$1,400 to $3,775 per string inverter, installedEstimated range, not a quote. The service page shows how it is built.
Solar panel cleaning$140 to $630 per cleaning visit, whole systemEstimated range, not a quote. The service page shows how it is built.
EV charger with solar$1,325 to $3,300 per Level 2 charger installedEstimated range, not a quote. The service page shows how it is built.
System inspection$165 to $355 per inspection visitEstimated range, not a quote. The service page shows how it is built.
Solar removal$3,725 to $12,600 per system removed for good (not put back)Estimated range, not a quote. The service page shows how it is built.
Solar photovoltaic installer wage, California mean$30.42 an hourWhat installers are paid, not what a job costs. BLS OEWS, May 2025.
Solar permit, typical city fee in California$372A typical figure from the city solar fee rows we have; your city's fee may be higher or lower.
Median installed price, host-owned residential PV, California, installed in 2025about $3.3 per watt before incentivesBerkeley Lab, 2026 Data Update; the figure is a chart label. By installer, medians span $2.4 to $6.3 per watt.
Utility interconnection application feePG&E $145, SCE $94, SDG&E $132SCE's figure is the CPUC's; SDG&E's is as of its page archived December 8, 2023. Not an installer price.
Cap on a city's residential PV permit fee$450 plus $15 per kW above 15 kWGov. Code 66015(a). Gov. Code sets this ceiling; with a written finding a city may charge more.
Residential electricity price, California, August 202629.75 cents per kWhEIA, one high-use month (30.92 cents in August 2025). A price, not a savings figure.
Solar panel installation$21,500 to $29,600 for a typical 7 kW rooftop system, before any incentive
Estimated range, not a quote. The service page shows how it is built.
Ground-mount solar$24,500 to $32,600 for a typical 7 kW ground-mounted system, before any incentive
Estimated range, not a quote. The service page shows how it is built.
Home battery$8,200 to $18,600 per home battery (about 10 to 13.5 kWh) installed, before any incentive
Estimated range, not a quote. The service page shows how it is built.
Panel removal and reinstall$220 to $435 per panel, removed and put back for roof work
Estimated range, not a quote. The service page shows how it is built.
Solar repair$370 to $1,250 per repair visit
Estimated range, not a quote. The service page shows how it is built.
Inverter replacement$1,400 to $3,775 per string inverter, installed
Estimated range, not a quote. The service page shows how it is built.
Solar panel cleaning$140 to $630 per cleaning visit, whole system
Estimated range, not a quote. The service page shows how it is built.
EV charger with solar$1,325 to $3,300 per Level 2 charger installed
Estimated range, not a quote. The service page shows how it is built.
System inspection$165 to $355 per inspection visit
Estimated range, not a quote. The service page shows how it is built.
Solar removal$3,725 to $12,600 per system removed for good (not put back)
Estimated range, not a quote. The service page shows how it is built.
Solar photovoltaic installer wage, California mean$30.42 an hour
What installers are paid, not what a job costs. BLS OEWS, May 2025.
Solar permit, typical city fee in California$372
A typical figure from the city solar fee rows we have; your city's fee may be higher or lower.
Median installed price, host-owned residential PV, California, installed in 2025about $3.3 per watt before incentives
Berkeley Lab, 2026 Data Update; the figure is a chart label. By installer, medians span $2.4 to $6.3 per watt.
Utility interconnection application feePG&E $145, SCE $94, SDG&E $132
SCE's figure is the CPUC's; SDG&E's is as of its page archived December 8, 2023. Not an installer price.
Cap on a city's residential PV permit fee$450 plus $15 per kW above 15 kW
Gov. Code 66015(a). Gov. Code sets this ceiling; with a written finding a city may charge more.
Residential electricity price, California, August 202629.75 cents per kWh
EIA, one high-use month (30.92 cents in August 2025). A price, not a savings figure.

How solar estimates are built: every Estimated range is a model and no quote stands behind it. The starting point is published national cost ranges for the job, from third-party cost guides that we haven't verified and don't cite. California's solar installer wage ratio to the US (1.09, BLS May 2025) is applied to them, and a typical city solar permit fee is added where the work needs one. The wage and permit rows show what installers are paid and what a city's schedule charges, and neither is a price. We haven't collected quotes. Full method.

Questions about solar in California

Who can install solar on a California home?

Someone holding a CSLB A, B, C-10 or C-46 license. CSLB's Solar Smart page says C-4, C-36 and C-53 cover only solar heating. Check the number and class on CSLB's lookup.

Can I claim the federal solar credit on a 2026 installation?

No, the IRS says the credit ends for property placed in service after December 31, 2025. Paying in 2025 for a system that is finished in 2026 does not qualify, because the installation completion date controls.

How much can a solar company ask for up front, and can I cancel?

A down payment of no more than $1,000 or 10 percent of the price, whichever is less, and you have three business days to cancel. The cancel window is five days for buyers 65 or older on contracts entered since January 1, 2021, and the contractor must refund within 10 days (B&P 7159, 7159.5).

What replaced NEM 2.0 for new systems?

Net billing (NBT), for interconnection applications since April 15, 2023 in PG&E, SCE and SDG&E territory. The CPUC credits exports at hourly values that are usually lower than import rates, and the NEM tariffs are closed to new enrollments.

Does California cap a solar permit at $450?

The statute's limit is $450 plus $15 per kilowatt above 15 kW, not a flat $450. Gov. Code 66015 lets a city go above it with a written finding, and the section is repealed January 1, 2034.

Must my city use SolarAPP+?

No, SB 379 requires an online automated permitting platform, and SolarAPP+ is one of them. Cities under 5,000 people and counties under 150,000 are exempt, and the CEC does not certify compliance.

How much does solar cost in California?

Our model gives $21,500 to $29,600 for a typical 7 kW rooftop system, before any incentive, an estimate and not a quote. Berkeley Lab prints about $3.3 per watt before incentives as the California median for systems installed in 2025, and installer medians run from $2.4 to $6.3 per watt.

California cities

Each California city page names the permit office where one is listed, the PV fee rows the city prints and its electric utility, and says what the city's pages don't show.

All 502 cities, A to Z
Sources on this page
  1. CSLB Solar Smart Read Oct 23, 2026.
  2. CSLB bulletin 20-22, solar contracts Read Oct 23, 2026.
  3. B&P Code 7159 (leginfo) Read Oct 23, 2026.
  4. CPUC Net Energy Metering and Net Billing Read Oct 23, 2026.
  5. IRS Residential Clean Energy Credit; IRS OBBBA provisions Read Oct 23, 2026.
  6. CSLB Solar Energy System Disclosure Document (13L-6) Read Oct 23, 2026.
  7. CSLB Licensing Classifications Read Oct 23, 2026.
  8. B&P Code 7170 (leginfo) Read Oct 23, 2026.
  9. CEC Solar Equipment Lists Program Read Oct 23, 2026.
  10. IRS FAQs on OBBB (25D) Read Oct 23, 2026.
  11. B&P Code 7169 (leginfo) Read Oct 23, 2026.
  12. CSLB Solar Energy System Supporting Information Read Oct 23, 2026.
  13. SCE Net Energy Metering FAQ; SCE Solar Billing Plan factsheet Read Oct 23, 2026.
  14. PG&E Net Energy Metering (NEM) Program Read Oct 23, 2026.
  15. SGIP program metrics (selfgenca.com) Read Oct 23, 2026. Confirm with the source before you rely on it.
  16. CPUC Self-Generation Incentive Program Read Oct 23, 2026.
  17. Government Code 65850.5 (leginfo) Read Oct 23, 2026.
  18. CEC Residential Solar Permit Reporting Program - SB 379 Read Oct 23, 2026.
  19. CEC California Energy Storage Permitting Guidebook Read Oct 23, 2026.
  20. SolarAPP+ Foundation: Where is SolarAPP+ available Read Oct 23, 2026. Confirm with the source before you rely on it.
  21. Government Code 66015 (leginfo) Read Oct 23, 2026.
  22. Solar permit fee, Riverside Read Oct 23, 2026.
  23. Solar permit fee, Oakland Read Oct 23, 2026. Confirm with the source before you rely on it.
  24. Solar permit fee, Chula Vista Read Oct 23, 2026. Confirm with the source before you rely on it.
  25. CPUC Electric Rule 21: Generating Facility Interconnections Read Oct 23, 2026.
  26. SDG&E Generation Interconnection 101; SDG&E NEM and Solar Billing Plan pages Read Oct 23, 2026. Confirm with the source before you rely on it.
  27. 2022 California Residential Code, Title 24, Part 2.5, R324.6 (ICC Digital Codes) Read Oct 23, 2026.
  28. Revenue and Taxation Code 73 (leginfo); BOE LTA 2024/031 Read Oct 23, 2026.
  29. CEC 2025 Single-Family Solar PV; CEC Building Energy Efficiency Standards Read Oct 23, 2026.
  30. BLS Public Data API (OEWS series OEUS060000000000047223101..13, OEUN000000000000047223101..13) Read Oct 23, 2026.
  31. SolarPanelMatch: how we estimate costs, California (editorial policy) Read Oct 23, 2026.
  32. U.S. Bureau of Labor Statistics, OEWS May 2025: Electricians (SOC 47-2111), California, mean hourly wage Read Oct 23, 2026.
  33. U.S. Bureau of Labor Statistics, OEWS May 2025: Electricians (SOC 47-2111), United States, mean hourly wage Read Oct 23, 2026.
  34. LBNL Distributed Solar & Storage 2026 Data Update (slide 37) Read Oct 23, 2026. Confirm with the source before you rely on it.
  35. EIA Electric Power Monthly Table 5.6.A Read Oct 23, 2026.
Do you install solar in California?If you hold a CSLB A, B, C-10 or C-46 license, you can apply to receive homeowner requests for the work and ZIP codes you choose.
See the partner page
Get matched