String inverter or microinverters, and who may swap them
A string inverter converts the power of a whole string of panels in one box. Microinverters sit under individual panels, which is why the model prices them per microinverter and a string inverter per unit. Ask the company which type your system has and which type the quote replaces, because the price table below carries a separate row for each.
CSLB's Solar Smart page lists A, B, C-10 Electrical and C-46 Solar as the classes that can legally install PV, and describes C-46 as covering work to install, modify, maintain and repair PV systems. The heating-only classes C-4, C-36 and C-53 aren't on that list. Look up the company's license number and class on CSLB's lookup before you sign.
String or micro: California inverter prices in the model
Our model puts a string inverter replacement at $1,400 to $3,775 per string inverter, installed. It begins with a single national range, widened 15 percent each side, and applies California's installer wage ratio of 1.09; the table also shows the microinverter row, priced per unit. Both are estimates and not quotes, neither adds a permit fee, and no federal credit comes off.
The ranges don't cover monitoring hardware, a battery tied to the inverter, a new electrical panel or roof access. Ask whether the price covers removing the old unit, the warranty on the new one and any utility paperwork.
| Item | Figure | What it is |
|---|---|---|
| Estimated range, not a quote | $1,400 to $3,775 per string inverter, installed | Built from one national published range, adjusted by the California solar installer wage ratio (1.09). Before any incentive: there is no federal credit for a system installed in 2026. Basis: no California company price for this job, so the national estimate stands. |
| Estimated range per microinverter, not a quote | $140 to $440 per microinverter, installed | Built from one national published range, adjusted by the California solar installer wage ratio (1.09). Before any incentive: there is no federal credit for a system installed in 2026. Basis: no California company price for this job, so the national estimate stands. |
| Solar photovoltaic installer wage, California mean | $30.42 an hour | A mean wage from BLS OEWS (May 2025), not an inverter price. |
| PV, first system/inverter, San Diego | $275.80 inspection ($154.20 plan check where plan review applies) | San Diego Information Bulletin 301 (no revision date printed). A fee for PV electrical permits; a building permit adds fees. |
Estimated range. Built from national published ranges (1 source), adjusted by California's solar installer wage ratio to the US (1.09, BLS May 2025), plus the city solar permit fee where the city publishes one. Not a quote. One California installer publishes its own quoted range (per watt and per battery), too few to build a range from; the others print blog averages, which we do not count. We have no California company price for this job, so the range is our national estimate alone. Full method. Prices as of Oct 23, 2026.
The CEC equipment lists and the model number on the quote
Listing on the California Energy Commission's solar equipment lists isn't a condition for installing an inverter in California, the CEC says, and some utilities and local governments use the lists, which are updated three times a month, in their applications. For PG&E, SCE and SDG&E, the joint Rule 21 instruction sheet dated 6/5/2025 verifies equipment through the CEC listing or the utility's own list. Through the CEC route, an inverter needs a "Y" under UL 1741 SB, 3rd Edition, and a "Y" or "Y*" for CSIP conformance. Get the model number in writing.
If the company says a new inverter will raise your output, that's a production claim, and Solar Smart says to get those in writing along with the warranty terms for the new unit.
Rule 21, review times and who tells the utility
Rule 21 is the CPUC tariff that sets interconnection, operating and metering requirements for generation connected to PG&E, SCE or SDG&E. LADWP and SMUD, as municipal utilities, run their own rules. PG&E says permission to operate typically takes 5 to 10 business days after it has the contractor's paperwork, up to 30. SCE says a simple solar-only request may get permission within 10 business days, and that paired storage or non-standard metering will need more time; SDG&E's October 2024 deck puts initial review at 15 business days.
Behind each utility's rules sits Rule 21's Material Modification. SCE's tariff sheet defines it as a change with "a material impact on cost or timing" of interconnection requests queued on the same date or later, or a change in the point of interconnection. Fees for a new request are on the interconnection and permits page.
PG&E's Form 79-1211 sorts an inverter swap by what goes in. A unit of the same make and model needs no worksheet. A like-for-like unit, which the form defines as "certified, same nameplate or smaller, same fault current or smaller", goes on the notification-only path if its output stays within the nameplate in your interconnection agreement and the operating mode doesn't change. On that path the system can come back on "without waiting for PG&E approval" once the worksheet has been in for at least 2 business days. Keep the filed copy.
Bigger inverters have a tier too. The form allows a larger nameplate by notification only when certified power controls limit real power output to the capacity in your agreement and the system stays at 100 kW or less; otherwise PG&E needs a new Interconnection Request. So does a battery added to a system that had none.
SCE and SDG&E word it differently. SCE's FAQ lets a qualified like-for-like replacement that keeps output within what SCE approved go by notice on Form 14-987, with no new application and no SCE approval. An increase of more than 10 percent of the original net output capacity, or 100 kW if that's less, needs a new application and SCE's approval. SDG&E's NEM application lists "changing inverters/turbines" as a modification to an existing agreement, and SDG&E lists Form 117-2300 as its worksheet, so ask the company which one it will file.
Papers to keep once the new inverter is in
Keep the new inverter's warranty and the invoice with your original contract and its cover-page disclosure. Customers on NEM 2.0 may stay on that tariff for 20 years from the date they interconnected, and NBT customers keep theirs for nine years, so keep the permission-to-operate letter from the original installation with them.
If an inverter fault turns out to be part of a wider problem, the solar repair page covers a diagnostic visit, and a battery tied to the inverter has its own rows on the battery page.
When an inverter problem can't wait
- An inverter that is smoking, burning or smells of burning, or fire at the panels or wiring: call 911 and keep clear.
- The inverter display or monitoring app shows a fault but nothing is hot, smoking or burning.
- Daily output is down but the inverter is quiet and cool.
What to read before you call
- Note the inverter's make, model and the exact message on its display or in the monitoring app.
- Find the warranty papers and the original contract.
- Check the exports line on your latest utility bill.
Does an inverter swap need a permit
San Diego's Information Bulletin 301 prices PV electrical permits by the first system or inverter: $275.80 for the inspection, a $154.20 plan check row where plan review applies, and a $12.16 mapping fee if applicable. Ask your building department whether a like-for-like swap needs an electrical permit, and ask the company who pulls it.
Whatever path the utility takes, PG&E's worksheet leaves approval from the local building department with the customer.
Ask for the company's contractor license number and look it up with your state's licensing board before you sign.
Questions people ask
Who can replace a solar inverter in California?
Ask for a CSLB number in class A, B, C-10 or C-46, the classes CSLB names for PV work. Confirm the number and class on CSLB's lookup.
Does an inverter replacement need a permit?
Ask your city's building department. San Diego, for one, prices PV electrical permits by the first system or inverter, at $275.80 for the inspection.
Does the new inverter have to be on the CEC list?
Not as a condition of installing it, the CEC says. For a PG&E, SCE or SDG&E interconnection, though, the utilities' Rule 21 instruction sheet checks the inverter against the CEC listing or the utility's own list.
Do I have to tell my utility about a new inverter?
It depends on the unit. PG&E needs no worksheet for the same make and model and a notification worksheet for a like-for-like unit, and SCE takes a qualified like-for-like replacement on Form 14-987, with no new application.
How much does an inverter replacement cost in California?
A string inverter comes out at $1,400 to $3,775 per string inverter, installed in our model, which is not a quote. The microinverter row in the table is priced per unit, not per system.
- U.S. Bureau of Labor Statistics, OEWS May 2025: Solar photovoltaic installers (SOC 47-2231), California statewide, mean hourly wage Read Oct 23, 2026.
- U.S. Bureau of Labor Statistics, OEWS May 2025: Solar photovoltaic installers (SOC 47-2231), United States (national), mean hourly wage Read Oct 23, 2026.
- SolarPanelMatch: how we estimate costs, California (editorial policy) Read Oct 23, 2026.
- BLS Public Data API (OEWS series OEUS060000000000047223101..13, OEUN000000000000047223101..13) Read Oct 23, 2026.
- Solar permit fee, San Diego Read Oct 23, 2026. Confirm with the source before you rely on it.
- CSLB Solar Smart Read Oct 23, 2026.
- CSLB Licensing Classifications Read Oct 23, 2026.
- CEC Solar Equipment Lists Program Read Oct 23, 2026.
- CPUC Electric Rule 21: Generating Facility Interconnections Read Oct 23, 2026.
- PG&E Net Energy Metering (NEM) Program Read Oct 23, 2026.
- SCE Net Energy Metering FAQ; SCE Solar Billing Plan factsheet Read Oct 23, 2026.
- SDG&E Generation Interconnection 101; SDG&E NEM and Solar Billing Plan pages Read Oct 23, 2026. Confirm with the source before you rely on it.
- CPUC Net Energy Metering and Net Billing Read Oct 23, 2026.
- B&P Code 7169 (leginfo) Read Oct 23, 2026.
- PG&E tariff form 79-1211 (Advice 6155-E-A, June 2021; D.19-03-013; Res. E-5035) Read Oct 23, 2026.
- SCE Electric Rule 21, Generating Facility Interconnections (tariff text) Read Oct 23, 2026.
- SDG&E, Form 142-02773; NEM Documents page Read Oct 23, 2026.
- PG&E/SCE/SDG&E joint Instruction Sheet, Rule 21 equipment certification (6/5/2025) Read Oct 23, 2026.