If the roof will need replacing while the panels are on it, removing and reinstalling the array is its own cost, so settle the roof first or price the removal into the plan. In Michigan the residential code says the roof must support the loads and penetrations must be flashed and sealed. In California the 2022 residential code sets the firefighter access pathways.
The roof decision is a timing decision
Panels stay on the roof for as long as the system runs. If the roof under the array has to be replaced in that time, the panels come off and go back on, and that removal and reinstall is its own job with its own cost line. When to remove or reinstall panels covers that job in each state.
So the question a homeowner can settle before signing is one of order: roof first, or panels now and a removal later. None of the code pages or utility pages this site cites gives a roof age or a remaining-life figure, so ask the company to state in writing whether its quote assumes your current roof stays. What those pages do give is what each state’s code expects of the roof, and the decisions below rest on that and on ordinary contract questions.
There’s no federal credit attached to the timing either way. The IRS says the Residential Clean Energy Credit “is not available for any property placed in service after December 31, 2025,” and that includes battery storage.
Michigan: what the code expects of the roof
The 2015 Michigan Residential Code is the current edition as of LARA’s notice, and Michigan’s rule R 408.30521a adds a rooftop PV section to it:
- PV panel systems mounted on or above the roof covering must comply with the code, Section R324 and NFPA 70.
- The roof must support the loads.
- The system is installed per the manufacturer’s instructions, with roof penetrations flashed and sealed.
Section R324 covers access and ventilation. As one city’s checklist reproduces the residential code, pathways at least 3 ft wide run from eave to ridge, single-ridge roofs need two of them, panels sit at least 18 in. from a hip or valley when they’re on both sides, and panels stay at least 3 ft below the ridge. The same checklist caps arrays at 150 ft by 150 ft, exempts roofs at 2:12 or flatter, and says ground mounts follow local fire separation. It’s a city document, not LARA’s text, so read those numbers as the shape of the rule and let the building office give the exact ones.
Midland shows how one city asks for this. It publishes separate Photovoltaic Systems Building and Photovoltaic Systems Electrical forms. They ask whether the system is on the roof or the ground, and they want structural calculations along with three-foot access paths, 18-inch valley clearance and 3 ft below the ridge.
The Michigan Public Service Commission’s consumer tips put rooftop panels at about 100 sq ft of roof per kW. They also say city or county rules may require a permit and inspection. The permit is pulled under the contractor’s state license number, and how solar permits work in Michigan sets out who does what.
Decisions for a Michigan roof
If the roof will need replacing during the system’s life, there are three options, and each company can price all of them:
- Replace the roof first, then install the system.
- Install now and plan a removal and reinstall when the roof is replaced, with that cost as its own line. The Michigan panel removal and reinstall page describes the job.
- Put the array on the ground instead. The ground mount page covers that job, and the checklist above says ground mounts follow local fire separation.
If your roof was replaced recently, bring its paperwork to the quote. Whatever you choose, ask the solar company for its warranty on the roof penetrations in writing, along with who’s responsible if one leaks.
California: what the code expects of the roof
Government Code section 65850.5 says a city or county shall administratively approve applications to install solar energy systems through a building permit or similar nondiscretionary permit, with review limited to health and safety.
Access is set in the 2022 California Residential Code, R324.6. It calls for not fewer than two pathways on separate roof planes from the lowest roof edge to the ridge, each not less than 36 inches wide, and at least one of them on the street or driveway side. At a horizontal ridge the clear setback is 18 inches on both sides for arrays covering 33 percent or less of the plan-view roof area, and 36 inches above that. Where sprinklers are installed under NFPA 13D or R313, the threshold becomes 66 percent. Roofs with a slope of 2:12 (17 percent) or less are exempt, and so are detached non-habitable structures.
Those values come from the 2022 edition. The 2025 code took effect January 1, 2026, and its requirements may differ, so ask your building department which edition it’s applying.
Decisions for a California roof
The same choice of order applies. Ask each company whether its quote assumes the existing roof stays, includes a new roof, or prices a removal and reinstall later; the California removal and reinstall page describes that job.
California adds one date. Revenue and Taxation Code section 73 excludes a new active solar energy system from reassessment only for systems completed before January 1, 2027. A system completed on or after that date falls outside the exclusion as the statute stands.
A newly built single-family home is a different case. The 2025 Building Energy Efficiency Standards, effective January 1, 2026, require solar PV on newly constructed single-family homes under section 150.1(c)14, with five exceptions, and the required size depends on the solar-access roof area. That standard doesn’t cover additions or alterations, so it doesn’t decide anything about the roof on an existing house.
Questions to put to the company
These work on any roof, in either state:
- Does the quote assume the current roof stays, and for how long?
- If the roof is replaced while the panels are up, who removes and reinstalls them, and what does that line cost?
- What warranty covers the roof penetrations, and who answers if one leaks?
- Which layout drawing goes to the permit office, and does it show the access pathways?
Lay the quotes side by side and keep the ones that price the roof options in writing.
Questions people ask
Should I replace my roof before installing solar?
If the roof will need replacing during the system's life, the options are to replace it first or to pay to remove and reinstall the panels later. Removal and reinstall is its own cost line, so ask the company to price it.
What does Michigan's code say about the roof under solar panels?
Michigan's rule R 408.30521a adds a rooftop PV section to the Michigan Residential Code. It sends rooftop PV to Section R324 and NFPA 70, says the roof must support the loads, and says to install per the manufacturer's instructions with penetrations flashed and sealed.
How much roof does a solar system need in Michigan?
The Michigan Public Service Commission says rooftop panels need about 100 sq ft per kW.
Do California solar installs need fire access pathways?
Yes. The 2022 California Residential Code R324.6 calls for two pathways at least 36 inches wide on separate roof planes, with exceptions for roofs at 2:12 or flatter.
- MPSC: Solar Power Consumer Tips
- Mich. Admin. Code R. 408.30521a (Cornell LII)
- City of Portage: Michigan Residential Code for Solar Installs Confirm with the source before you rely on it.
- LARA notice: 2021 Code Injunction, Residential Part 5 and Energy Part 10
- City of Midland Permit Fee Listing (7/1/2025) and PV permit forms Confirm with the source before you rely on it.
- LARA BCC-339 Electrical Permit Application (Wayback copy 2025-11-06)
- IRS FAQs on OBBB (25D)
- 2022 California Residential Code, Title 24, Part 2.5, R324.6 (ICC Digital Codes)
- Government Code 65850.5 (leginfo)
- CEC 2025 Single-Family Solar PV; CEC Building Energy Efficiency Standards
- IRS Residential Clean Energy Credit; IRS OBBBA provisions
- Revenue and Taxation Code 73 (leginfo); BOE LTA 2024/031
Cost figures are estimates, not quotes. Rules and prices change: confirm with your local building department and ask any solar installer for the license number. We are a referral service, not a solar installer. How we check.
Your solar request is on its way
Keep your phone close for a call or text, because your job request has gone to one solar installer serving your area.
- 1Expect a call or text from the installer's own number, which you might not recognize, at a time we don't control. If your phone stays quiet, no installer took the request, so treat it as unmatched and use your state's license lookup to find an installer yourself.
- 2Ask the installer for a written quote with the total cost including financing, the system size in kW DC and the cost per watt before any incentive. Get its contractor license number, look it up with your state's licensing board, and ask who files the utility application and who pulls the permit.
- 3Reply STOP to a text from the installer and its messages end. To stop us sharing your details, use the Do Not Sell or Share page.
- Find a recent electric bill: it names your utility, whose rules govern the credit for power you send out.
- Note how old the roof is and whether trees or buildings shade it for much of the day.
- If you already have a system, gather the contract, the warranty papers and the monitoring login.
- Leave the roof and the inverter to the installer: you don't need to climb, open or disconnect anything for the visit.
- Ask for the license number and look it up with your state's licensing board before you sign.