SolarPanelMatch
Hollywood · Broward County · Florida

Solar installers in Hollywood, FL

Tell us about the solar job, and we'll send it to one solar installer that works Hollywood.

What to watch for here: Its Comprehensive Schedule of Fees, adopted October 1, 2026 under Resolution R-2026-308, prices the building permit by value of work, all disciplines.

Residents
152,935
Homes pre-1980
74.7%
Median home value
$374,200

Figures above: Census ACS 2019 to 2023 five-year estimates (B01003, B25034, B25077). Census figures in the text below come from the newer ACS 2020 to 2024 release.

Get matched with a solar installer in Hollywood

Pick the job, give your ZIP code, then add how we should reach you; all three steps are free.

What do you want done?
Something else · all 11 services

The form asks for a phone number only after it finds an installer that covers your ZIP.

You pay nothing, and the installer that gets your request pays us. How it works

Solar in Hollywood

Ask Hollywood’s Building Division which fee schedule applies to the project and for a permit estimate; charges depend on the scope and value of the work. Building Division customer service is 954.921.3335, option 1 for Building, Monday to Thursday 7:00 a.m. to 6:00 p.m.; customers needing extensive assistance must be in line by 5:30 p.m. The department is at City of Hollywood, 2600 Hollywood Boulevard, Hollywood, FL 33020-4807. A look at Hollywood in the ACS shows 1969 as the housing stock's median build year, 58.9 percent of households owning their home and $410,600 at the median for owner-occupied homes. A High-Velocity Hurricane Zone address: Hollywood, in Broward County, where the Florida Building Code sets stricter wind-design rules.

What solar costs near Hollywood

We haven't collected solar quotes from Hollywood, so this page gives no city price. The statewide estimates are on each service page, and the Michigan page lists them with what solar installers are paid ($24.30 an hour in BLS data for May 2025, which is pay, not price), the printed city permit fees and the utility application fees. How we estimate costs.

Licenses and permits for solar in Hollywood

MCL 339.5737(1) requires a license for the business of electrical contracting, and the Act's definition of electrical wiring covers generating equipment, so ask the installer for its electrical contractor license number. The utility's interconnection application is a separate filing from the city permit.

Thinking about solar, or need work on a system you have?Say what you need, and one solar installer that works Hollywood will call you back.
Get matched
Get matched