Interconnection and permits in Ann Arbor, MI

Short answer

In 2022 NREL selected Ann Arbor as one of 12 communities to compete in Step 2 of the SolarAPP+ Prize.

What to watch for in Ann Arbor: A 2020 expedited path with no solar line items, a $35.00 inspection, and a Solarize FAQ range of $2.70 to $3.80.

Written by the SolarPanelMatch editorial teamLast reviewed Oct 23, 2026How we check

Interconnection and permits in Ann Arbor

Interconnection and permits is pre-selected. Add your ZIP to continue.

What do you want done?
Something else · all 11 services

The form asks for a phone number only after it finds an installer that covers your ZIP.

You pay nothing, and the installer that gets your request pays us. How it works

Ann Arbor particulars

Ann Arbor's Building, Rental and Inspection Services runs an expedited path for residential solar that needs only an electrical permit. Its 2020 checklist says the city doesn't charge line-item solar fees, application fees or plan review on that path. The 2020 fee sheet matches: "Solar Panels per set of 3 panels $0," with a $35.00 inspection where one applies. Both papers are six years old. Turnaround is printed as 3 to 5 business days for expedited residential work and 5 to 10 for the rest.

A non-expedited job adds a building permit: a $15 application, $37.50 to $100 for plan review and a $150 to $400 permit by project cost. Its number, per the city's page, is 734-794-6263. NREL named Ann Arbor on November 30, 2022 as one of 12 communities picked for Step 2 of the SolarAPP+ Prize, but whether the city went live on SolarAPP+ isn't stated, so ask the office. The MPSC map shows DTE Electric as the utility here; check your address with DTE.

The city's undated Solarize FAQ puts the southeast Michigan average at about $3.13 per watt, within $2.70 to $3.80. It also describes a federal credit the IRS says isn't available for property placed in service after December 31, 2025. Divide a quote's total by its watts and set that beside the FAQ's range.

Interconnection and permits in Ann Arbor: what to know

For a permit today, the city's 2020 checklist says expedited residential solar needs an electrical permit, with 3 to 5 business days printed as the turnaround. Other residential projects need a building permit too, and print 5 to 10 business days.

DTE Electric is Ann Arbor's utility on the state's map (check your address with DTE). Its application costs $50 at Levels 1 and 2. Under its July 1, 2026 procedures, DTE has 10 business days to classify a complete application as conforming, incomplete or non-conforming, and the applicant then has 60 business days to fix any deficiency.

Permits for interconnection and permits in Ann Arbor

The state electrical permit application asks for the contractor's Michigan license number, so the permit is pulled under it.

When to call 911 and when it can wait

Call right away
  • Smoke, a burning smell or fire at the inverter, panels or wiring is a 911 call. Leave the equipment alone.
Can usually wait
  • An application the utility hasn't answered yet.
  • A permit sheet you haven't been able to find.

What to settle before the paperwork starts

Try this first: ask Building, Rental and Inspection Services whether Ann Arbor routes solar permits through SolarAPP+ today.

  1. Ask who files the utility application and who pulls the city permit.
  2. Ask your building department for its current solar sheet and whether a building permit is also needed.
  3. Ask the company which of these fees its price includes.
  4. Look up its electrical contractor license number with LARA.
  5. Ask for the utility's approval to operate in writing before the final payment.

What interconnection and permits cost

The estimate below is the Michigan-wide one, adjusted for Michigan wages and not for Ann Arbor in particular. The same table is on the interconnection and permits page. How we estimate costs. Prices as of Oct 23, 2026.

Interconnection and permit fee evidence, Michigan, prices as of Oct 23, 2026
ItemFigureWhat it is
DTE Rider 18 application, Level 1 and 2$50DTE's interconnection procedures dated July 1, 2026. Study or construction fees may apply if triggered.
Consumers Energy distributed generation application review, Levels 1 to 3$50Consumers' interconnection cost table. Supplemental review, system impact and facilities study are listed at $0.
Solar photovoltaic electrical permit, Detroit$278 per inverter connection per visit (grid-connected); $165 per visit (no grid)BSEED fee schedule effective January 1, 2024. A subsequent installation inspection visit is $176 each.
Electrical permit, alternative power, Grand Rapids$42.00 for the first 10 kW, then $4.00 per added kWFY2027 fee schedule, electrical.
Electrical permit, solar per kW, Royal Oak$20.00 per kWMaster fee schedule effective July 1, 2025.
Electrical permit, alternative power, Wyoming$40.00 for the system and first 10 kW, then $4.00 per added kWFee schedule effective 2026. The electrical application fee is $50.00 and includes one inspection.
Electrical permit, solar panels, Taylor$19.00 per panel, plus a $50.00 application fee2025-2026 schedule.
Electrical permit, per PV module up to 20 kW, Kalamazoo$7.00 per module, plus an $83.00 application fee2026 application. Residential PV also needs a building permit.
Expedited residential solar electrical permit, Ann Arbor$0 for line-item solar feesThe city's 2020 checklist and fee sheet say it doesn't charge for them; an inspection is $35.00 if applicable. The city may have changed fees since.
Electrical permit, solar panel modules, East Lansing$12 per moduleCity electrical permit fees, undated. The building side is separate: a $60 solar permit application fee, and $140 for systems under 10 kW covering the application and rough and final inspections.
Electrical permit, alternative energy up to 50 kW, Battle Creek$50.00Schedule effective July 1, 2026. Per-panel rows of $2.00 and $1.00 are also printed; ask the city whether both apply.
State electrical permit schedule, solar photovoltaic system$75.00 application, then $2.00 or $1.00 per panelLARA's state form applies only where the state inspects, and its column layout is ambiguous.
DTE Rider 18 application, Level 1 and 2$50
DTE's interconnection procedures dated July 1, 2026. Study or construction fees may apply if triggered.
Consumers Energy distributed generation application review, Levels 1 to 3$50
Consumers' interconnection cost table. Supplemental review, system impact and facilities study are listed at $0.
Solar photovoltaic electrical permit, Detroit$278 per inverter connection per visit (grid-connected); $165 per visit (no grid)
BSEED fee schedule effective January 1, 2024. A subsequent installation inspection visit is $176 each.
Electrical permit, alternative power, Grand Rapids$42.00 for the first 10 kW, then $4.00 per added kW
FY2027 fee schedule, electrical.
Electrical permit, solar per kW, Royal Oak$20.00 per kW
Master fee schedule effective July 1, 2025.
Electrical permit, alternative power, Wyoming$40.00 for the system and first 10 kW, then $4.00 per added kW
Fee schedule effective 2026. The electrical application fee is $50.00 and includes one inspection.
Electrical permit, solar panels, Taylor$19.00 per panel, plus a $50.00 application fee
2025-2026 schedule.
Electrical permit, per PV module up to 20 kW, Kalamazoo$7.00 per module, plus an $83.00 application fee
2026 application. Residential PV also needs a building permit.
Expedited residential solar electrical permit, Ann Arbor$0 for line-item solar fees
The city's 2020 checklist and fee sheet say it doesn't charge for them; an inspection is $35.00 if applicable. The city may have changed fees since.
Electrical permit, solar panel modules, East Lansing$12 per module
City electrical permit fees, undated. The building side is separate: a $60 solar permit application fee, and $140 for systems under 10 kW covering the application and rough and final inspections.
Electrical permit, alternative energy up to 50 kW, Battle Creek$50.00
Schedule effective July 1, 2026. Per-panel rows of $2.00 and $1.00 are also printed; ask the city whether both apply.
State electrical permit schedule, solar photovoltaic system$75.00 application, then $2.00 or $1.00 per panel
LARA's state form applies only where the state inspects, and its column layout is ambiguous.

These rows are fees that utilities and cities publish, each with the date or fiscal year of the schedule. None is an installer's price, and the estimate model has no row for this service. Full method.

Questions about interconnection and permits

How long does DTE take to approve a solar system?

DTE says the process takes approximately six weeks. It has 10 business days to say whether an application is complete, and you have 60 business days to fix deficiencies.

How much does a solar permit cost in Michigan?

There's no statewide figure, because each city sets its own fee. The cities we cite run from $0 in Ann Arbor, on a 2020 sheet, to $278 per inverter connection per visit in Detroit.

Does Michigan require a building permit for solar too?

Many cities do, including Dearborn, Kalamazoo and East Lansing. Ask your building department what it needs.

Ready when you are.Describe the problem and one solar installer that works Ann Arbor will call you back.