What removal for good involves
A removal is the opposite of an installation: the system is disconnected, the panels and wiring come off, and the roof is patched where the mounts were. It's a different job from lifting panels for roof work and putting them back, which is covered on the panel removal and reinstall page.
The model prices the removal itself, so ask whether disposal and roof patching are in the quote or on separate lines. Michigan's residential code says roof penetrations for rooftop PV are flashed and sealed (R 408.30521a), so ask who seals the holes the mounts leave and whether your roofer's warranty covers that patch.
What removing a solar system costs in Michigan
Our estimate is $2,975 to $10,000 per system removed for good (not put back). It's a model, and bids will differ, because it's built from one published national range and scaled by what Michigan solar installers are paid against the US mean. It adds no permit fee, though disconnecting a grid-tied system involves the utility and may involve a city permit. The range covers the removal only.
No federal credit is in the range; the IRS says the credit is not available for property placed in service after December 31, 2025. Get disposal and patching quoted as separate lines.
| Item | Figure | What it is |
|---|---|---|
| Estimated range, not a quote | $2,975 to $10,000 per system removed for good (not put back) | Built from one national published range, adjusted by the Michigan solar installer wage ratio (0.87). Before any incentive: there is no federal credit for a system installed in 2026. |
| Solar photovoltaic installer wage, Michigan mean | $24.29 an hour | What installers are paid (BLS OEWS May 2025), not what you are charged. Only 310 people are in the Michigan estimate. |
How we estimate costs: the Estimated range row comes out of a model, so treat it as a planning figure and never as a quote. It takes one published national range for this job (a cost guide from a third-party site that we haven't verified and don't cite) and multiplies it by Michigan's solar installer wage ratio to the US (0.87, BLS May 2025). The range is before any incentive: the federal residential clean energy credit does not apply to systems installed after December 31, 2025. The wage and permit rows are what installers are paid and what the city charges, and neither is a price. We have not collected quotes, and too few Michigan installers publish prices to show a range. Full method. Prices as of Oct 23, 2026.
What to ask DTE or Consumers Energy first
Under DTE's Rider 18, excess generation goes into an Excess Generation Bank, where the credits "do not expire and cannot be withdrawn or transferred." Consumers Energy applies distributed generation credits to all electric charges. Both describe how credits work while a system runs.
Notice comes first. Consumers' program page says that if you plan to make changes to your system, you must notify it ahead of time. Michigan's interconnection rule, R 460.984, requires notice of any plan to modify a system once its agreement is signed.
Neither the utilities' pages nor that rule says what happens to a credit bank once a system comes off for good, so put that question to your utility in writing before the crew disconnects anything.
Then end the agreement. Consumers' standard interconnection agreement runs until the customer ends it on thirty days' prior notice, on a default or by mutual agreement (section 16). DTE's overview has the customer sign a Parallel Operating Agreement, so ask DTE how you end yours and how it wants to hear that the system is gone.
If you're selling the house or you lease the panels
Selling can change the property tax picture. Michigan doesn't count residential PV up to 150 kW whose output doesn't exceed annual use as added value until the home is sold, and after a sale the assessor may add it (MCL 211.27(2)(p)). The solar and home sale guide covers the choice between keeping, selling with and removing a system.
If the panels stay with the house, the Consumers paperwork moves too. Its standard agreement says the customer must notify the utility in writing on a sale or transfer, and the agreement ends on that notice unless Consumers agrees to keep it in force until an equivalent one is signed (section 19). A buyer taking on a system with an existing Consumers agreement can keep the program tenure and credits by filing a New Move-in Form, with a $25.00 application fee. Processing can take up to a month, so put the form on the closing checklist.
If the system is leased or the power is bought under a PPA, you don't own it. Ask the owner what the contract says about removal and whether it can transfer to a buyer instead. The leases, PPAs and loans guide explains what to look for.
Who should do the work
The law's definition of electrical wiring covers generating equipment, so ask the company for its Michigan electrical contractor license number and look it up with LARA. LARA's licensing page says that license needs a master electrician of record and that Michigan has no reciprocity with other states, so a crew licensed elsewhere still needs the Michigan number.
The permit is pulled under that contractor's state license number, and a city may want its own sign-off. Detroit issues its own licenses locally. A homeowner in an owner-occupied single-family home is exempt from the license, not from the permit or the utility, and we'd leave the equipment alone.
Where the panels go once they're off
The EPA says discarded solar panels are solid waste and may be hazardous waste under federal law (RCRA) if lead or cadmium makes them fail a toxicity test. Some panels are hazardous and some aren't, even within one model from one maker. EPA's universal waste page, updated September 18, 2026, lists five types under the federal rules, from batteries to aerosol cans, with no solar panels among them, and says EPA is planning to propose new rules for end-of-life panels.
In Michigan, EGLE's universal waste inspection form, revised May 2025, lists seven categories of universal waste, from batteries and lamps to antifreeze and consumer electronics. Solar panels aren't on it, though a form isn't a rule. EPA tells homeowners to contact state or local recycling agencies.
Recycling exists, but not at scale. EPA says a crystalline-silicon panel is about 75 percent glass by weight, that the aluminum frame, copper wire and junction box are easily recycled, and that panel recycling isn't yet happening on a large scale in the United States. Inverters can go with e-waste, racking with scrap metal and batteries through battery recycling programs. If you hope to sell the panels, EPA says the reuse market hasn't gained traction, and a reused panel has to clear grid interconnection, fire, building and electrical codes. Ask the removal company in writing where each part goes, and whether disposal is its own line on the quote.
What your city may want before the system comes off
Ask your building department which permit line, if any, covers a removal, because many of the solar rows this site cites are priced per inverter connection, per panel or per kW. Detroit's BSEED schedule, effective January 1, 2024, prices solar photovoltaic work per visit, at $278 per inverter connection for a grid-connected system and $176 for each subsequent installation inspection visit. Dearborn's checklist requires both a building and an electrical permit for solar. Write the city's answer, and any fee, on the removal quote.
When to call 911 and when it can wait
- Smoke, a burning smell or fire at the inverter, panels or wiring is a 911 call. Leave the equipment alone.
- A removal you're still pricing.
- A lease or PPA question for the owner of the system.
What to settle before the crew comes
- Ask your utility what happens to your account and any banked credits.
- Ask the owner of a leased system what the contract says.
- Get removal, disposal and roof patching quoted as separate lines.
- Ask for the electrical contractor license number and look it up with LARA.
- Ask your city whether it wants a permit or a sign-off.
Permits and paperwork
Ask your building department whether it wants a permit or a sign-off for a removal, and your utility how it wants to be told. The contractor's state license number goes on any permit, and LARA points to the Michigan Residential Code for residential requirements.
Ask for the company's contractor license number and look it up with your state's licensing board before you sign.
Questions people ask
What happens to my DTE credits if I remove my solar panels?
DTE says credits don't expire and can't be withdrawn or transferred. Put the question of what happens to the bank after a removal to DTE in writing before the crew disconnects anything.
How does a home sale affect a solar system in Michigan?
Michigan doesn't count qualifying residential PV as added value until the home is sold, and after a sale the assessor may add it. A leased system or PPA raises a separate question: whether the contract transfers to a buyer.
Is there a federal credit for removing solar panels?
No. The Residential Clean Energy Credit covered new property installed 2022 through December 31, 2025, and is not available after that date.
Who should take a solar system off my roof?
A company holding a Michigan electrical contractor license, since the system is wired into your home. Ask for the number and look it up with LARA, and ask who patches and seals the roof penetrations.
Do I need a permit to remove solar panels?
Ask your building department, because many of the city solar rows this site cites are priced per inverter connection, per panel or per kW. Dearborn, for one, requires both a building and an electrical permit for solar.
- U.S. Bureau of Labor Statistics, OEWS May 2025: Solar photovoltaic installers (SOC 47-2231), Michigan statewide, mean hourly wage Read Oct 23, 2026.
- U.S. Bureau of Labor Statistics, OEWS May 2025: Solar photovoltaic installers (SOC 47-2231), United States (national), mean hourly wage Read Oct 23, 2026.
- SolarPanelMatch: how we estimate costs, Michigan (editorial policy) Read Oct 23, 2026.
- Mich. Admin. Code R. 408.30521a (Cornell LII) Read Oct 23, 2026.
- DTE Electric: Rooftop Solar Distributed Generation Rider 18 letter Read Oct 23, 2026.
- Consumers Energy: Distributed Generation Read Oct 23, 2026.
- DTE: Solar Panel Interconnection Process Overview Read Oct 23, 2026.
- Michigan State Tax Commission Bulletin No. 6 of 2020 Read Oct 23, 2026.
- MCL 211.27 Read Oct 23, 2026.
- MCL 339.5737 (legislature.mi.gov) Read Oct 23, 2026.
- MCL 339.5701 definitions (legislature.mi.gov) Read Oct 23, 2026.
- LARA: Electrical Examination, Licensing/Registration & Application Information Read Oct 23, 2026.
- LARA BCC-339 Electrical Permit Application (Wayback copy 2025-11-06) Read Oct 23, 2026.
- City of Detroit BSEED Fee Schedule (effective January 1, 2024; file dated March 31, 2025) Read Oct 23, 2026.
- City of Dearborn Residential Solar Checklist Read Oct 23, 2026.
- Mich. Admin. Code R. 408.30801 (Cornell LII) Read Oct 23, 2026.
- LARA Bureau of Construction Codes: Code Books Read Oct 23, 2026.
- IRS FAQs on OBBB changes to 25C, 25D (FS-2025-05) Read Oct 23, 2026.
- IRS: Residential Clean Energy Credit Read Oct 23, 2026.
- Consumers Energy, Distributed Generation program page (footer 2026) Read Oct 23, 2026.
- Mich. Admin. Code R 460.984, Modifications to the DER (LII copy of the Michigan Administrative Code) Read Oct 23, 2026.
- Consumers Energy, Standard Level 1, 2 and 3 Interconnection Agreement for projects up to 550 kW with certified equipment Read Oct 23, 2026.
- US EPA, End-of-Life Solar Panels: Regulations and Management Read Oct 23, 2026.
- US EPA, Universal Waste Read Oct 23, 2026.
- EGLE Materials Management Division, Universal Waste Small Quantity Handler inspection form EQP5186 Read Oct 23, 2026. One caveat: this is our interpretation, and the source doesn't say it outright. Confirm it with the source before you rely on it.
- US EPA, Solar Panel Recycling Read Oct 23, 2026.